COMMERCIAL BUILDING

Daffodil Hotel and Spa

Situated within a conservation area on the edge of Grasmere Lake, this luxury hotel and spa was severely affected by the floods in December 2015.

The flood caused extensive damage to the whole ground floor of the hotel including the spa area and contaminated the water within the spa.

The team at BuildzoneUK were contracted to carry out the reinstatement works to the two function rooms, bar and spa.

To enable the hotel to re-open to guests as soon as possible, work initially concentrated on the entrance, bar area and two function rooms. Once these works were completed the hotel was open for business, including hosting a large number of weddings and conferences whilst Buildzone carried out the remaining works to the spa area.

Project details:

Type: Flood damage
Timeframe: 29 weeks
Value: £1 million

Key sectors

Education
Healthcare
Cladding
Insurance
Passive Fire Protection
Listed buildings

COMMERCIAL BUILDING

Daffodil Hotel and Spa

Situated within a conservation area on the edge of Grasmere Lake, this luxury hotel and spa was severely affected by the floods in December 2015.

The flood caused extensive damage to the whole ground floor of the hotel including the spa area and contaminated the water within the spa.

The team at BuildzoneUK were contracted to carry out the reinstatement works to the two function rooms, bar and spa.

To enable the hotel to re-open to guests as soon as possible, work initially concentrated on the entrance, bar area and two function rooms. Once these works were completed the hotel was open for business, including hosting a large number of weddings and conferences whilst Buildzone carried out the remaining works to the spa area.

Project details:

Type: Flood damage
Timeframe: 29 weeks
Value: £1 million

Key sectors

Education
Healthcare
Cladding
Insurance
Passive Fire Protection
Listed buildings

COMMERCIAL BUILDING

Daffodil Hotel and Spa

Situated within a conservation area on the edge of Grasmere Lake, this luxury hotel and spa was severely affected by the floods in December 2015.

The flood caused extensive damage to the whole ground floor of the hotel including the spa area and contaminated the water within the spa.

The team at BuildzoneUK were contracted to carry out the reinstatement works to the two function rooms, bar and spa.

To enable the hotel to re-open to guests as soon as possible, work initially concentrated on the entrance, bar area and two function rooms. Once these works were completed the hotel was open for business, including hosting a large number of weddings and conferences whilst Buildzone carried out the remaining works to the spa area.

Key sectors

Education
Healthcare
Cladding
Insurance
Passive Fire Protection
Listed buildings

Project details:

Type: Flood damage
Timeframe: 29 weeks
Value: £1 million